Project Summary At a prominent confectionery site in York, Newsome has implemented a high-capacity 400 kW chiller, marking the noteworthy execution of the project. Designed to reinforce ESG targets, the installation improves system dependability while cutting overall power consumption and CO₂ emissions. https://socialbuzzmaster.com/story6384862/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction