The 25mm thick large steel tube is pushed While using the stop closed by a metal shoe. On achieving the necessary driving resistance, a full duration cage is reduced in for the tube and stuffed with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://riveryrjyo.blogdun.com/33207817/cast-in-situ-piles-in-dhaka-an-overview