The main park incorporates a ability of two hundred MW even though Sandrini II provides a capability of one hundred MW. The total cost of both projects weren't disclosed having said that, through construction, more than 200 personnel were used. The tasks are envisioned to find out A few positions https://fresnosolaragency.blogspot.com/2024/12/4-hacks-to-find-reliable-commercial.html